
Free Solo
2018 · 1h 40m


Released Oct 1, 2018 · Documentary · 1h 52m
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Writer
Loading…
0 reviews
No public reviews yet. Be the first to share your thoughts.
Write a public review
2018 · 1h 40m

2018 · 1h 57m

2018 · 1h 37m

2018 · 1h 39m

2018 · 1h 35m

2018

2018 · 2h 8m

2018 · 1h 25m

2018 · 1h 36m

2018 · 1h 38m

2018 · 1h 56m

2018 · 26m